Early Bird Registration
Take advantage of our early bird registration and save over $100 on the price of admission.

Early Bird Deadline:
August 16th

The Industry is Under Pressure!
World Oil HPHT Drilling and Completions Conference 2013 to focus on pressure.

Gulf Publishing Company invites you to attend the 2013 World Oil High-Pressure, High-Temperature Drilling and Completions Conference, to be held September 26–27 in Houston, Texas, at the Norris Conference Centers-CityCentre. The 2013 event will feature a high-level, two-day technical program devoted to knowledge sharing and best practices in high pressure, high temperature drilling. Topics slated for discussion this year include: operator responsibility; materials and materials testing; equipment design, development and implementation; subsea technology; MDP applications under HPHT conditions; real-time production monitoring; case histories; and more.

The HPHT Drilling and Completions Conference offers both a local and global perspective providing you with the latest information on:

  • International HPHT operations from South America, Asia and more
  • The industry-wide impact of regulatory changes on operations and policy
  • Effective solutions for pressure and temperature challenges specific to HPHT settings
  • Technological advancements and best practices for improved HPHT drilling, completions and production
  • Lessons learned by professionals on active operator and service company projects

For more information about this conference, please contact Melissa Smith, Events Director, Gulf Publishing Company at +1 (713) 520-4475 or melissa.smith@gulfpub.com.


 HPHT 2013 AGENDA HIGHLIGHTS 
 
The preliminary agenda will be available soon. Program highlights include:

 
 TRACK 1 DRILLING TRACK 2 COMPLETIONS 
 
  • The Future of Well Control for Deepwater HPHT Drilling Christian Leuchtenberg, Managed Pressure Operations, PTE LTD
  • CASE STUDY: High Solid Content- High density- Engineered Particle Size Distribution Slurry Allows for Successful Cementation of HPHT Well Crossing Fault, in Gulf of Mexico Degaul Nana, Schlumberger
  • CASE STUDY: Full Scale MPD and Closed Loop Implementation Approach to Well Construction in a Previously Undrillable Field Stephen O’Shea, Weatherford
  • CASE STUDY: Geophysical/Geological Applications Used to Address HPHT Drilling Hazards Pre-drill and Post-drill, Case Study: Jaguar-1 Well, Offshore Guyana Allan Kean, Repsol
 
  • CASE STUDY: Integrating DPR with Real Time Monitoring System for Digital Field Application: Key Enablers for Strategic Production Optimization of Wells Producing from Deep HP-HT Sour Carbonates in North Kuwait Bhavadip Navinchandra Vaidya, Kuwait Oil Company
  • Qualification of T&C Riser Connections with Metal to Metal Seals and Sour Service Compliance for the HPHT Environment Mike Tricarico, V&M USA Corp
  • Ultra High Pressure Facturing in KS Area Xuefang Yuan, Tarim Oilfield Company of CNPC
  • The Use of Nanotechnolgy in the Development of a Distributed Fibre-optic Temperature Sensor for Subsea Applications Gary McDowell, School of Engineering & Built Environment, Glasgow Caledonian University
 

Details

  • When

  • Thursday, September 26, 2013 - Friday, September 27, 2013
    08:00 - 17:00
    Central Time

  • Where

  • Norris Conference Centers - CityCentre
    City Centre
    803 Town and Country Lane
    Houston, Texas 77024
    USA
    713 780 9387

Outlook Outlook
iCal iCal
Google Google
Yahoo! Yahoo!
MSN MSN
Top